20160323 - CL RT 14 Const. (HRB) - nwherald

hnews_mon404_road_const_COVER

H. Rick Bamman - hbamman@shawmedia.com
A worker with ALF Cartage unloads concrete pipe along Rt. 14 south of Rt 176. Work is ongoing to rebuild and widen Route 14 from West Lake Shore Drive in Woodstock to just south of Crystal Lake Avenue. The project widens two lanes in each direction, separated by a 22-foot landscaped median. A 10-foot bike path will be included from Lake Shore Drive to just past MCC. Traffic signals will be improved or installed at eight intersections along the route.